1-8Ĭlassification society.RINA Sub-notification (Unattended operation).UMS Service level.Essential Flange standard.EN Plant supply voltage.3 x 440 V Plant control voltage.230 V Pilot voltage.24 V Frequency.60 Hz Pressure gauge calibration.Multi-scale(Bar, MPa, kg/cm2) Thermometer calibration.✬ Language on signs.English Ambient air temperature.45 ✬ Table of contents Technical data and performance curve Description Technical data for boiler plant. MISSION OC Control System (Touch) MISSION control system.21 Operation of the panels.22Ĭommisioning and service.23 Burner sequence diagram.24 Flame safeguard.25 Menu structure for panels.26 Pressure atomising burner KBO Descriptions.17 Installation.18 Fuel oil pump unit.19 Operation and maintenance.20 Instruction MISSION OC boiler Descriptions.7 Operation and maintenance.8 Feed and boiler water.9 Water level gauge.10 Safety valves.11 Feed water system.12 Regulating feed water valve.13 Chemical dosing pump.14 Oil detection equipment.15 Salinity alarm equipment.16 Table of contents Plant specification System concept Technical data and performance curve.1 General arangement drawings.2 Steam and water system.3 Fuel oil system.4 Mission OC control panel drawing.5 Spare part.6
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |